HomePage       Bookmark
 
Water stop tie/strip
 Water stop tie
 Mitigatory complex swelling strip
 BK-S mitigatory swelling strip (PN putty type)
 BK-C water swelling strip (PN putty type)
Environment protecting membrane
 PVC waterproofing membrane
 TS Enhanced polymer polyethylene fiber composite waterproof membrane
Rock bolt
 General centre-holed grouting rock bolt
 Self-boring type centre-holed grouting rock bolt
Grouting Materials
       没有产品
Geogrid/ Geotextile
 CURVED PP MACRO FIBER
 POLY PROPYLENEF FIBER-MESH
 POLYPROPYLENE MONOFILAMENT
 Filament Geotextile
 HDPE Uniaxial Plastic Geogrid
 POLY PROPYLENEF FIBER-MESH
 CURVED PP MACRO FIBER
 POLYPROPYLENE MONOFILAMENT
 filament geotextile
 HDPE Uniaxial Plastic Geogrid
 PP Uniaxial Plastic Geogrid
 

General centre-holed grouting rock bolt
(Publishing time:2009-7-29 9:31:56  Clicks:108)

  Brand:Baokang
  Sorts:All product > Rock bolt
  Model:D25
 
Description:  

1. Introduction

General centre-holed grouting rock bolt is a new supportive medium for tunnel crowned archsidewallupward archside slopeside wall of deep foundational hole installing. The rock bolts make effect together with shot-Crete and come into being a part of bearing  the weight of annulussoil nailed wallminitype pegsrock anchorbearing capacityacting on tunnelside slope and deep foundational hole. Furthermore, the rock bolt can be also used in digging face as a temporary supportive way .The bolt is widely used in supporting the railway, road, deep foundation and tunnel, which can meet the pull requirements of 100~250kn .It can be constructed together with drill set.

2.   Component of products

General centre-holed grouting rock bolt is composed of alloyed rod bodysplintscrew capvent-pipegrouting-stop stopper and rubber hammer. See Fig.

The alloyed rod body is the full screw thread rod body which is made of raw and proceeds material.

Splint and screw cap They are pre-stressed exterior and locked fastening pieces .There are air-bleed holes attached to the guide pins.

vent-pipeIt is fixed on trailing bar by the air-bleed hole of the splint with one end inserted into the bore, and the other outside. It can be used collaborated with the centre-holed grouting rock bolt, according to the way of installation.

Grouting-stop stopper and rubber hammer: They are the subsidiary materials made of robber, which play a great part. Not only can they enhance the effectiveness of grouting, but also prevent the dust going into the body while the bolt being inserted into the bore, which may cause weak effect and the grout or jam pour out of the bore.   

 

3. The specification and technical parameters

Specification

General centre-holed grouting rock bolt

 

Mechanics Index

Utmost tension resistance

Nominal external

diameter

Diameter for drilling

Screwing spiral direction

Standard length

Type-

depth max

180KN

mm

mm

 

m

m

D25a

180

25

42

Left

2.5/3/3.5/4/4.5/

5/5.5/6/8/10

D25b

150

25

42

D25c

120

25

42

D27a

240

27

42

D27b

200

27

42

D27c

180

27

42

D29a

290

29

46

D29b

210

29

46

D32a

290

32

50

D32b

250

32

50

D38a

440

38

75

D38b

420

38

75

D50a

640

50

110

D50b

580

50

110

*The date of the table can be changed for meeting the clients’ requirement

  

 4. Technical code for construction

  1. General centre-holed grouting rock bolt is mainly composed of centre-holed rock bolt body, grouting-stop stopper, splint, vent-pipe and nutthey can be used for rock support projectespeciallyused for anchor project of supporting the top of the underground work by middle and long.

  2.The depth and diameter of drilling should meet the requirement of designwhen drilling the hole.

 3.Before installing the rock bolt, check the middle bore and find whether it is smooth. Please clean up in time if the extraneous matters exist.

4. After the bolt reaching the depthclean the bore by water and air.

Then install the grouting-stop stopper, splint and nut for temporary fastness until the water and air return to orifice.

5.Grout should use neat cement paste and cement pasteRatio11.Advised to increase the ratio of water and cement for 0.4-0.5, the diameter of gravel should not be larger than 0.1mm, when using cement mortar.

6.Grouting from the middle borefastening the nut when the intensity up to 5.0 Map

7. The method of the installing the General centre-holed grouting rock bolt should conform the process flow Drilling——Cleaning——Installing rock bolt for grouting and re-grouting——Fastening and end processing.

5. Advantages of the products

 1. It had carried out the function of grouting tubule by centre-holed designing.

 2. The press grouting can be carrying out when grouting is full.

 3. The character of centering is good.

4. Easy for installing

 
 

COPYRIGHT©2003-2008 Beijing Jinbaokang Science & Technology Co.,Ltd ALL RIGHTS RESERVED   京ICP备05015513
TEL:010-81761769  010-86710951  15910943506   FAX:010-81761769  Email:johnjbk@gmail.com jbktech@yahoo.com.cn
Address: Room A01, No 7, Penglai Flat, Beiqijia town, Changping district, Beijing, China